Deferred ProcrastinationOpen Source Engineering DefProc logo
       Welcome   Projects   Hire   Blog                

    Winter Closedown

    Dec 30, 2011 • Patrick Fenner • Short-URL http://marksabino.com/defproc/b/eqbja/

    After the inter-bank-holiday break, it’ll be all back to normal next week. Time to measure some bike parts so I can finish the new chainline structural design.

    In the mean time, why not take another look at the Front Axle Assembly A002_R002 and the more recent Laser-cut Lattice Living Hinges and Lattice Hinge Test Results.

    Happy New Year!


    Post meta

    Categorised: DEFERRED PROCRASTINATION 

    Taggged:

    Browse posts

     Lattice Hinge Test Results Best Size for a Capacitor Bank of an Electric Vehicle? 

    Comments

    Blog comments are closed, please get in touch with us.

    •  contact@defproc.co.uk
    •  +44(0)845 508 2555
    •  Deferred Procrastination
    • DoES Liverpool
      32-36 Gostins Building
      Liverpool
      L1 4LN

    © 2015 Deferred Procrastination